Reports

This section contains reports relating to the Abitibi Solar Project. The documents posted below are downloadable. Click here to download Adobe Acrobat Reader.

1 November 2012
Construction Plan Report - Rev 1.pdf
Decommissioning Plan Report - Rev 2.pdf
Design and Operations Report - Rev 1.pdf
Executive Summary - Rev 0.pdf
Natural Heritage - Environmental Impact Study - Rev.1.pdf
Natural Heritage - Evaluation of Significance - Rev 1.pdf
Natural Heritage - Records Review - Rev 1.pdf
Natural Heritage - Site Investigations Report - Rev 1.pdf
Noise Assessment Study Report Rev 1.pdf
Project Description Report - Rev 1.doc.pdf
Stage 1 -2 Archaeological Assessment Report - 115kV Transmission Line.pdf
Stage 1 -2 Archaeological Assessment Report.pdf
Water Body - Environmental Impact Study Rev 2.pdf
Water Body - Records Review Report - Rev 1.pdf
Water Body - Site Investigation Report - Rev 1.pdf

23 August 2012
Natural Heritage Environmental Impact Study - Rev 1.pdf
Water Body Environmental Impact Study Rev 1.pdf

20 June 2012
Draft Executive Summary.pdf
Draft Construction Plan Report.pdf
Draft Decommissioning Plan Report.pdf
Draft Design and Operations Report.pdf
Draft Natural Heritage Environmental Impact Study.pdf
Draft Natural Heritage Evaluation of Significance Report.pdf
Draft Natural Heritage Records Review Report.pdf
Draft Natural Heritage Site Investigation Report.pdf
Draft Noise Assessment Study Report.pdf
Draft Project Description Report.pdf
Draft Stage 1 and 2 - Archaeological Assessment Report.pdf
Draft Transmission Line - Stage 1 and 2 Archaeological Assessment Report.pdf
Draft Water Body Environmental Impact Study.pdf
Draft Water Body Review Report.pdf
Draft Water Body Site Investigation Report.pdf

24 May 2012
Notice of a Public Meeting

22 June 2011
Updated Draft Project Description Report

1 June 2011

Draft Project Description Report
Project Location Map